Completed June 2025

This Arapahoe bathroom started with a layout and finish palette that felt stuck in the 1980s: a large built-in tub, dated gold finishes, and two separate single vanities that broke up the room.

Geringer Construction removed a wall and rebuilt the plan around better circulation. The two vanities became one double vanity, the oversized tub area was replaced with a freestanding tub, and the room gained a large shower with a bench plus a separate water closet. The finished bath feels more open, more useful, and much more composed.

Bathroom Remodeling

Expanded Marble Bathroom

The original bath had a heavy built-in tub, dated gold finishes, and two separate single vanities that made the room feel chopped up. Geringer Construction removed a wall, combined the vanities into one double vanity, and reworked the layout to make room for a freestanding tub, a large shower with a bench, and a separate water closet.

See More Bathroom Remodeling Work

Have a Similar Project in Mind?

Tell us what you are planning and we will help you understand the next step.